Dijkstra’s Method and CPM Evaluation

Dr. George Gafencu, DBA, PMP, DTM Dijkstra’s method and the Critical Path Method (CPM) evaluation is the topic of the current posting. The condition of the experiment is a relatively small schedule (17 tasks) developed rigorously based on the Project Management Institute’s guidelines [1]. Meanwhile, Strategy & Innovation, LLC needed a safe and fast method of […]

Genetic Algorithms versus Critical Path Method

Dr. George Gafencu, DBA, PMP, DTM A comparison between the critical path implemented via Genetic Algorithms versus Critical Path Method is the topic of the current posting. The conditions of the experiment is a relatively small schedule (17 tasks) developed rigorously based on the Project Management Institute’s guidelines [1]. All tasks have a predecessor and […]